Progress on an ITER ECH Transmission system development and testing
POSTER
Abstract
Progress on further development of the ITER ECH Transmission system design and testing of waveguide components will be presented. Work on the preliminary design of the system configuration is proceeding based on the conceptual design from the ITER Organization. Requirements for precision of waveguide supports and components are being analyzed and thermal and mechanical modeling of prototype components is being performed. Several prototype components have been procured from industry and some have been tested to nearly 1 MW at 170 GHz for long pulses at JAEA in Japan. A high power test stand is being developed at ORNL to provide component, system, and instrumentation tests at 1 MW cw or higher power conditions. The high voltage power supply has been tested and 140 GHz and 170 GHz gyrotrons are expected to be operational in the near future.
Authors
-
Timothy Bigelow
ORNL, Oak Ridge National Laboratory, ORNL/UT-Battelle, Oak Ridge National Laboratory, Oak Ridge, TN, USA
-
G.R. Hanson
ORNL, ORNL/UT-Battelle, Oak Ridge National Laboratory
-
David Rasmussen
Oak Ridge National Laboratory, ORNL/UT-Battelle, Oak Ridge National Laboratory, Oak Ridge, TN, USA
-
Alan Barker
ORNL/UT-Battelle
-
Carl Dukes
ORNL/UT-Battelle
-
Stephen Killough
ORNL/UT-Battelle
-
Brian Peters
ORNL/UT-Battelle
-
Robin Rumbolt
ORNL/UT-Battelle
-
Chuck Schaich
ORNL/UT-Battelle
-
Roberto Sanabria
ORNL/UT-Battelle
-
Karen McElehaney
ORNL/UT-Battelle
-
John White
ORNL/UT-Battelle
-
Stephen Allison
ORNL/UT-Battelle